Snubbing Case History #64

Snubbing Case History #64

Snubbing Case History #64 Fishing Job while Snubbing Objective: 0-35 MPA Procedure: Tubing recorders released from downhole, and got stuck in the tubing hanger. The well was flowing past the recorders and the combination of flowback and sand, parted the tubing string...
Snubbing Case History #63

Snubbing Case History #63

Snubbing Case History #63 Objective: Snub in Slick String Well Information: Tight Hole Procedure: Rig up S29 on 15K Stripping rams/rig up on 15K primary BOPS. Rig in power tongs, pressure test rams to 15K. Rig up Fox Hole system. Snub in Slick String at 35 +/-....
Snubbing Case History #63

Snubbing Case History #61

Snubbing Case History #61 Objective: Snub out 3 ½” coil string and set permanent packer for future completion. Well Information: 1500 meter 1000kPa injection well Procedure: Rig up and pressure test self-contained snubbing unit. Make up spear and go it and retrieve...
Snubbing Case History #63

Snubbing Case History #60

Snubbing Case History #60 Objective: Wellhead upgrade on horizontal CO2 injection well: reposition permanent packer Well Information: CO2 injection well, 1300 meters vertical and 1000 meters horizontal 5000 kPa Procedure: Rig up and pressure test self-contained...
Snubbing Case History #59

Snubbing Case History #59

Snubbing Case History #59 Objective: Mill out BP at surface Well Information: 2800m Sweet multi zone gas well. 43MPa Procedure: Rig up 10k stripping rams on well, pick up snubbing unit and rig out 5K stripping rams. Rig up unit on 10K stripping rams. Place concrete...