Snubbing Case History #63
Objective: Snub in Slick String
Well Information: Tight Hole
Procedure: Rig up S29 on 15K Stripping rams/rig up on 15K primary BOPS. Rig in power tongs, pressure test rams to 15K. Rig up Fox Hole system. Snub in Slick String at 35 +/-. Staging in ram to ram 4900 meters of 2⅞ TBG. Land tubing hanger, pressure test, and rig out equipment. Travel to location from base.