Snubbing Case History #34

Objective: POOH with production tubing, clean out fill, install production tubing

Well Information: 6,000 Kpa, 1,400m deep

Procedure: Rig up snubbing unit and pressure test. Strip out tubing hanger, tubing and BHA. RIH bit float sub, tubing to bottom. Rig up power swivel and clean out to TD. POOH same. RIH BHA and production tubing. Rig out snubbing unit.

Time on location: 13 hours.