Snubbing Case History #28

Objective: Drill out surface plug.

Well Information: Re-entry is required into abandoned well.

Procedure: Rig up snubbing unit and pressure test. Run in hole: bit, bit sub c/w floats, mud motor, and drill string to 20m drill through plug, run into 140m, and drill down 500m. Break through. Run in 700m circulate dead. Land tubing and rig out snubbing unit.

Time on location: 17 hours