Snubbing Case History #32
Objective: Fish lost perforating gun and run production tubing.
Well Information: 3,500 Kpa gas well, 500m deep. Perforating gun stuck in tubing spool.
Procedure: Rig up and pressure test spools and snubbing unit. Run fishing tools latch onto fish and POOH. Lay down recovered fish. Strip in on/off skirt, BHA and 500m tubing. Latch onto packer, come off and space out tubing, strip in tubing hanger latch onto packer, land tubing and rig out.
Time on location: 7.5 hours