Coil tubing and Nitrogen Pumping Case History #15

Objective: Utilize Mayperf drilling tool to perforate multiple zones in a well. Procedure: Rig up and deploy Mayperf drilling tool utilizing 33 meters of lubricator. A total of 5 sets of perforations were opened up using the Mayperf drilling tool and 50.8mm coil tubing. Time on location: 30 hours over 3 days