Snubbing Case History #54

Objective: Snub in seal assembly, 2 hydraulic set packers, 3 sliding sleeves, blast joints and 73mm tubing.

Well Information: 18mPa, 3400 meter multi zone gas well

Procedure: Rig in rig assist snubbing unit according to customer and IRP 15 egress requirements. Snub in the hole with seal assembly, packers, sliding sleeves, blast joints and tubing to surface. Tubing was inspected and pressure test on the way in the hole. Threads also were inspected and perfect torque used to make connections. Space out, sting into permanent packer and set hydraulic packers. Rig out snubbing unit.

Time on location: 36 hours over 3 days