Snubbing Case History #13

Objective: Snub in 33.4mm siphon string.

Well Information: 6 Mpa sour gas well, 2,050m deep.

Procedure: Rig up 179mm to 281mm cross over flange and offset DSA. Rig up snubbing unit and pressure test. Snub in mule-shoe w/ tubing end plug, pup, “Q” nipple, pup, and 209 joints 3.4mm tubing through primary tubing hanger. Strip in secondary tubing hanger and land tubing. Rig out snubbing unit and spools.

Time on location: 10 hours